STEP ONE:

Remove boulders, rubble, debris and weeds from the area.

STEP TWO:

Using an organic soil/sand/turf underlay mix, spread approximately a six inch cover over area and rotary hoe into the existing soil layer.

STEP THREE:

Level the area with a lawn leveler or bobcat. Remember to be aware of drainage requirements.

STEP FOUR:

Apply a starter fertiliser before laying the turf. Hancey’s Turf has a range of fertilisers appropriate for all turf varieties.

STEP FIVE:

Once the ground is prepared, lay your turf as soon as it arrives on site.

STEP SIX:

Roll your new lawn to remove any air pockets, unevenness and to ensure good contact with the soil.

STEP SEVEN:

Water thoroughly, keeping the root zone saturated for two weeks.

STEP EIGHT:

After the lawn is established reduced watering to once a week. Mow the new lawn approximately four weeks after laying the turf. This should be a light mowing.